Projects

ZNA Cadix, Antwerp | New Antwerp hospital set to become a city landmark

ZNA Cadix, Antwerp | New Antwerp hospital set to become a city landmark

Ziekenhuis Netwerk Antwerpen (ZNA) has been building a new central hospital in Antwerp since mid-2016, which is set to become a “landmark in the city”. VK Studio and architectural practice Robbrecht & Daem were responsible for the design. ZNA Cadix is due for completion in 2020.

ZNA needed new facilities in Antwerp, and the winning construction team, comprising Kairos, VK Studio, Robbrecht & Daem and Bladt Building Engineering, proposed building the new hospital in a central location.

The 65,000 m², 19-storey building will be located between park Spoor Noord, the docks and the city centre. ZNA opted for a green location, with implications for mobility around the site. Motorised traffic, including ambulances and logistical transport, will pass underground. Above ground, a public healthcare boulevard with a square will provide space for pedestrians and cyclists. There will also be a tram and bus stop in front of the hospital entrance.

Amper een achtste van de woningen van de gesimuleerde woningen zonder koelsysteem vertoont een goed comfort.

The ground floor will accommodate restaurants and shops, which will also be open to people who are not visiting the hospital.

340 patients

The new hospital will bring together the services at ZNA Stuivenberg and ZNA Sint-Erasmus, and will have capacity for 340 patients. It will include an emergency department, operating theatres, intensive care, a burns centre, inpatient wards, a day hospital and an outpatient clinic. The building will be more than just a hospital: the ground floor will accommodate restaurants and shops, which will also be open to people who are not visiting the hospital. In this way, ZNA aims to integrate Cadix Hospital into the city.

ZNA has carefully considered circulation within the building. Hospitals can get very busy, after all. To minimise walking distances, key departments will be located next to one another. Separate lifts will be provided for priority medical services, bed transport and logistics.

Considerable attention has been paid to the building’s architecture: ZNA Cadix is located along major routes and will have a significant impact on the cityscape. Its façades, clad in glass mosaic in light green and blue tones, will certainly contribute to this. The building also had to be flexible and adaptable.

Comfortniveaus en gemiddeld verbruik in alle woningen in functie van het koelsysteem.

ZNA Cadix is due for completion in 2020.

Borefield

A borefield has been installed beneath the hospital to harness thermal energy from the ground for heating and cooling. This involved 40 boreholes, each 150 metres deep. A combined heat and power (CHP) installation will also be installed, with a thermal capacity of 195 kWh and an electrical capacity of 150 kWh. The technical infrastructure also includes systems for distributing various fluids and medical gases. To optimise all the hydraulic applications, ZNA enlisted the software of Hydronic System Optimisation (Hysopt). In collaboration with VK Engineering and mechanical services contractor Cegelec, Hysopt is developing dynamic simulations to optimise the hydraulic design. The aim is to improve comfort for patients and staff while reducing energy consumption and CO2 emissions.

Een zakelijke vraag aan Hysopt? Get in touch

Wie aan ZNA Cadix werkte

  1. softwareHysoptIn this story
  2. designVK StudioIn this story
  3. architectural practiceRobbrecht & DaemIn this story
  4. construction teamKairosIn this story
  5. construction teamBladt Building EngineeringIn this story
  6. building services contractorCegelecIn this story
  7. engineering consultancyVK EngineeringMentioned in ZNA Cadix, Antwerp | Multidisciplinary approach delivers an optimised installation at ZNA Cadix
  8. clientZiekenhuisnetwerk Antwerpen (ZNA)Mentioned in ZNA Cadix, Antwerp | Multidisciplinary approach delivers an optimised installation at ZNA Cadix

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectZNA Cadix
  • SubjectProjects
  • CompanyHysopt
  • CompanyVK Studio
  • CompanyRobbrecht & Daem
  • CompanyKairos
  • CompanyBladt Building Engineering
Share this article

Follow on Installatie & Bouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.