Sustainable solutions and maximum comfort for users

Cegelec specialises in advising on, designing, engineering and installing technical systems in buildings for tertiary and industrial use. For the refurbishment of Westland Shopping Center, it drew on its expertise to renovate the electrical installation, install new sanitary facilities and fit the new HVAC systems. Jean-Marc Warichet, Business Unit Manager Elec South-West, and Jean-Pierre D’Ambrosio, Business Unit Manager Plumbing South, told us about their involvement in the project.

“We began by modifying the primary electrical circuit,” explains Jean-Marc Warichet. “We replaced the high-voltage substations one by one, renewed the generator, installed UPS systems and, above all, replaced electrical panels that were more than twenty years old, without disrupting the smooth running of the various shops. We also installed brand-new, energy-saving LED lighting.
Particular attention was paid to the fire detection system: “We had to rationalise the entire system by centralising the fire detection units. In the shopping centre’s original design, each shop had its own fire detection system. Now, when a shop changes use, the new tenant will connect to the central installation. Thanks to this new integration, the site manager can see everything that is happening, not only in Westland Shopping Center but also in the shops,” concludes Jean-Marc Warichet.

As sustainable as possible
Jean-Pierre D’Ambrosio, Business Unit Manager Plumbing South at Cegelec, in turn highlights the sustainable aspects of the project: “First and foremost, this is a BREEAM Excellent project with very high quality standards. We used sustainable, environmentally friendly solutions, notably rainwater harvesting. We also prioritised local supply chains. For example, the pipes come from a company based less than 20 kilometres from the site. Finally, geothermal energy, which powers the heat pumps and air conditioning, helps achieve substantial energy savings and make the building as sustainable as possible.”
“First, we had to dismantle the old pipework, which was almost thirty years old. We installed three new, larger air handling units on the roof and replaced the air distribution network with new multi-air grilles for air purification and cooling the spaces. The addition of two extra entrances to Westland Shopping Center led to the installation of warm-air curtains. Finally, heat pumps were installed, along with two new cooling towers to regulate the temperature in the gallery and shops,” continues Jean-Pierre D’Ambrosio.

Adapting to ensure visitor comfort
It was not all plain sailing. “The biggest challenge was maintaining a constant temperature and good air quality throughout the site during the works, to ensure visitors remained comfortable. We were able to adapt quickly, and that is our strength,” concludes Jean-Pierre D’Ambrosio.
Question about this story? Ask your question
Who worked on it
Westland Shopping Center, renovation
- building servicesCegelec
Keep following this
Get an email when a new story is published. No account needed.
- ProjectWestland Shopping Center
- SubjectProjects