ZNA Cadix, Antwerp | Multidisciplinary approach delivers an optimised installation at ZNA Cadix

A major project such as ZNA Cadix calls for an impressive technical installation. Cegelec, a VINCI Energies brand, was awarded the HVAC and electrical works. At the initiative of client Ziekenhuisnetwerk Antwerpen (ZNA), Hysopt dynamic simulation software was used to optimise the hydraulic systems.
Cegelec entered the tender for the project as part of the THV Ziekenhuis Noord (Interbuild-MBG) consortium and won the contract. From the tender stage, Cegelec’s experts worked with the team at engineering consultancy VK Engineering on the preliminary technical design. “The first discussions date back to 2011,” recalls Walter Wens, project manager for the electrical works at Cegelec.

‘How the installation is sized and commissioned has a major impact on both comfort levels and energy performance.’ (Image: Thomas Geuens)
Borefield
Heat is generated by 3 condensing gas boilers rated at 1.75 MW, a CHP unit rated at 390 kWth and a 277 kW heat pump connected to the borefield. Yves Hendrickx, project manager for the HVAC works at Cegelec, explains: “40 boreholes have been drilled, each 140 metres deep. A heat exchanger is also connected to the borefield for free cooling. Cooling is also provided by 3 water-cooled chillers rated at 1.28 MW. Heat from the chillers is dissipated by 6 dry coolers on the roof. The ventilation system comprises a total of 53 air handling units, with a combined airflow of 370,000 m³/h, including 17 units for hygiene areas. Humidification is provided by electric resistance steam humidifiers with a total capacity of 1,500 kg/h.”
A hospital also needs an extensive electrical installation. Walter Wens lists the various systems: “A 4,500 kVA medium-voltage installation has been installed. This is the normal supply, using mains electricity. In addition, an emergency supply with generators rated at 2,000 kVA and a 600 kVA UPS with batteries have been provided. The electrical installation also includes fire detection, with around 6,000 detectors, a sound system with 1,200 speakers and a data network with approximately 11,000 outlets. Finally, there are access control systems, with provision for 900 badges, CCTV with 150 cameras, a nurse call system and an intercom system to enable nursing staff to communicate with one another.”

As a simulation tool, Hysopt makes it possible to estimate system performance at the design stage. (Image: Hysopt)
HVAC, electrical systems and maintenance
One of Cegelec’s strengths is that, as a multidisciplinary company, it can take on both HVAC and electrical installation work. Hendrickx explains: “After handover, our colleagues at VINCI Facilities provide follow-up and take on the maintenance and management of the technical installations we have installed. This includes preventive maintenance, corrective maintenance, a comprehensive warranty and the necessary reinvestment over the contract period, ensuring the installations continue to operate optimally for 20 years. Many more projects are planned for the future, in which Cegelec will take responsibility not only for HVAC and electrical systems, but also for other services, such as plumbing and sprinkler systems.”
Alongside delivering a technical installation to be proud of, Walter Wens is proud of this project for another reason. “The various companies responsible for the building services work together exceptionally well. That is not always a given on a construction site. Communication between them is clear and constructive, and everyone shares the same goal: delivering an excellent end result. That makes working together a pleasure.”

‘The first discussions date back to 2011.’ (Image: Thomas Geuens)
Dynamic simulations
In addition to heating, cooling and air handling, the technical infrastructure includes systems for distributing various fluids and medical gases. It was crucial to client ZNA that the entire installation should work properly. Tom Havermans, environmental coordinator at ZNA, explains: “We place great importance on responsible stewardship. We demonstrated this earlier by going beyond the government’s requirements when applying for the building permit. We also pay close attention to correct commissioning and hydraulic balancing. How the installation is sized and commissioned has a major impact on both comfort levels and energy performance. That is why we were among the first in the hospital sector to start using dynamic simulations.”
In consultation with VK Engineering and Cegelec, Hysopt software was used as a design and simulation tool. “Dynamic simulation using Hysopt software has become standard practice in all our renovation and new-build projects,” says Havermans. “Two people from Cegelec completed Hysopt training to get to grips with the software package,” adds Cegelec’s Yves Hendrickx. “This meant our own staff could enter the installation into Hysopt.”
Havid El Khaoui, Support Engineer at Hysopt, provided the necessary support and expertise. “As a design tool, it links all the individual components together to create a complete hydraulic and control calculation model. This makes the design process much faster and allows more intelligence to be built into the model,” says El Khaoui.
As a simulation tool, Hysopt makes it possible to estimate system performance at the design stage, taking the installation’s part-load behaviour into account. El Khaoui explains: “Concept options were simulated to achieve the highest possible level of comfort for patients and staff at ZNA Cadix, while minimising energy consumption and CO2 emissions. The concepts’ energy cost savings ranged from 10% to 28% per year, while CO2 emissions were reduced by between 9% and 11%. An optimal result, thanks to Hysopt software.”
Finally, the existing model is used to create a digital twin of the installation. The dynamic as-built record will be of great value in the further development of the installation.
Een zakelijke vraag aan Hysopt? Get in touch
Wie aan ZNA Cadix werkte
- architectural practiceRobbrecht & DaemMentioned in ZNA Cadix, Antwerp | New Antwerp hospital set to become a city landmark
- construction teamKairosMentioned in ZNA Cadix, Antwerp | New Antwerp hospital set to become a city landmark
- construction teamBladt Building EngineeringMentioned in ZNA Cadix, Antwerp | New Antwerp hospital set to become a city landmark
- building services contractorCegelecMentioned in ZNA Cadix, Antwerp | New Antwerp hospital set to become a city landmark
- engineering consultancyVK EngineeringIn this story
- clientZiekenhuisnetwerk Antwerpen (ZNA)In this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectZNA Cadix
- ThemeElectrical infrastructure under pressure
- SubjectProjects
- CompanyVK Engineering
- CompanyZiekenhuisnetwerk Antwerpen (ZNA)
- CompanyHysopt
- CompanyVINCI Facilities