Today, we design as if every building were permanently running at full capacity. As if all the occupants were at home at the same time, meaning all the building services had to perform at maximum capacity at once. That has to change, because the reality is far more nuanced. One way to help bring about that change is to stop seeing the construction of a building as the sum of separate disciplines and instead adopt an integrated vision and approach that also takes the time factor into account.

Take coastal apartments. On average, a large proportion of them stand empty for up to 90% of the year. Yet we often design heating systems, electrical supplies and charging infrastructure as if every apartment were occupied all year round. The same applies to car parks: some developers are providing 100 charging points for 100 parking spaces, even though only a small proportion of cars are electric and those spaces are empty 75% of the time on average.

For years, the construction sector has trained itself to design for peak demand. That felt safe. But today, we are increasingly running up against its limits: energy is becoming more expensive, raw materials scarcer and building services more complex. We need to dare to ask whether more automatically means better. For me, that is one of the most important challenges for the years ahead.

One factor contributing to the problem is that we still too often view buildings as the sum of separate disciplines. Architecture, building services, finance, operation: everyone works within their own framework. But a building does not function in silos. Everything affects everything else. A decision about ventilation affects energy consumption. Mobility affects electrical infrastructure. Material choices determine long-term maintenance costs. 

That is why I strongly believe in an integrated approach based on three elements: culture, money and materials.

Culture is about collaboration: being willing to look beyond the boundaries of your own discipline, including in financial and contractual matters, and to take the longer term into account. In the Netherlands, one party is more often explicitly given responsibility for ensuring this integration. In Belgium, projects are still too often fragmented. Everyone optimises their own part, but no one oversees the whole. The architect’s brief is also limited, and they are not trained for this role.

Money, contrary to what I still often see, goes far beyond the initial investment. A cheap system that uses a lot of energy or proves difficult to adapt can become an expensive choice in the long run. We should therefore take a much broader view of buildings, including their financing and taxation, over their entire life cycle

Then there are materials: the physical reality of materials, building services and raw materials. The construction sector has an enormous ecological impact. This means that, for every project, construction partners need to ask themselves together what is really needed. Not in theory, but in concrete terms.


In my view, the future of building services is therefore less about more technology and more about better coordination. This will give us a better understanding of actual use, less oversizing, lower investment costs and less waste. 


In fact, this does not require a revolution, just common sense and the effort to seek one another out and work together.  

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectThe pen
Share this article

Follow on Installatie & Bouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.