Complex electrical engineering

From the electrical services (high-voltage cabin, UPSs, emergency power supplies, diesel generator, and so on) through to access control, the data network, fire detection, lighting, and more: this was the scope of work for Elektriciteitswerken Janssens on the Astor project. “Our package was initially described very briefly, but in the end we took responsibility for the full engineering of almost all the electrical services. Fortunately, we were able to handle the associated challenges smoothly, thanks to our extensive experience in healthcare construction,” says managing director Peter Ledoux.
Elektriciteitswerken Janssens can rightly call its work on the Astor buildings in Geel a ‘total project’. The company installed all the electrical services, with the exception of the nurse call system, which the client installed itself. “It was not an easy project, as a large number of changes were made ‘en cours de route’ to optimise everything down to the last detail,” explains Peter Ledoux. “This meant a huge amount of engineering and drawing work went into the project. It was also our first time working with CLT. At first, it took some getting used to, especially as the construction process moved very quickly, with one storey completed every two weeks, and we had to integrate all the cabling into the floor build-up at speed each time. But in the end, everything worked out well. Looking back, perhaps we could have got even more out of it, for example by drilling the light points into the prefabricated timber frame structure in advance. That is certainly a lesson we will take into future projects.”
No brain surgery
Elektriciteitswerken Janssens has plenty of experience building residential care centres, so the Astor site was not its first. “Our extensive experience in healthcare construction was a great advantage on this project,” says Ledoux. “Although the complex incorporates every electrical service imaginable, it was certainly not brain surgery from a technical point of view, and the installation went smoothly. The main challenge was that we had to keep adding to the installation each week, submit new plans, make adjustments, and so on. It was also a huge benefit that
we could draw on our many years of knowledge and expertise, and working with main contractor Hooyberghs was as enjoyable as ever. We are now putting the finishing touches to the work. By the end, we will have spent around 16 months working on the Astor site. It was an extremely intensive and complex project, especially given the sheer volume of preparation work, but the result is well worth it!”
Question about this story? Ask your question
Who worked on it
Astor in Laakdal
- elektrotechniekenElektriciteitswerken Janssens
- main contractorHooyberghs
Keep following this
Get an email when a new story is published. No account needed.
- ProjectAstor
- SubjectProjects
- CompanyElektriciteitswerken Janssens
- CompanyHooyberghs