Sustainability was a major focus in the development of the Tivoli Green City project. This requires more than an efficient heating system: system performance also depends on effective flue gas evacuation. The stainless steel chimneys from Schiedel, the European market leader, provided the right solution.

Schiedel has built up considerable expertise in chimneys and flue gas evacuation in Belgium and abroad. The company supplied flue gas systems for high-profile projects including the new town hall in Hasselt, Corda Campus in Hasselt, industrial bakery Lantmännen Unibake in Londerzeel, the football stadiums of RSC Anderlecht, KV Oostende and KAA Gent, AZ Zeno hospital in Knokke, CHR La Citadelle in Liège, and all the sites of an international sports brand’s European distribution centre in Ham. Tivoli Green City in Laeken adds another impressive reference to the list.

TIVOLI GREENCITY LAKEN

The solution chosen comprised Prima Plus single-wall stainless steel chimneys and ICS double-wall stainless steel chimneys, used in combination, as well as the HP5000 for the CHP unit.

HVAC contractor Dauvister (EDF Luminus), based in Francorchamps, installed 3 condensing boilers, 1 combined heat and power (CHP) unit and 1 pellet boiler. Schiedel supplied the chimneys. Marc Grootaers, project manager at Schiedel, explains: “For the CHP unit, we needed a special chimney that could withstand positive pressure of up to 5,000 Pa. The condensing boilers required a chimney that could withstand positive pressure of up to 200 Pa.” The final choice was Prima Plus single-wall stainless steel chimneys and ICS 25 double-wall stainless steel chimneys. The HP5000, the highest-performing system on the market for this type of application, was used for the CHP unit.

Limited space

“There was little space available in the technical shaft,” Marc Grootaers continues. “Developers naturally want to maximise the space available for the homes, but that makes our work more difficult.”

TIVOLI GREENCITY LAKEN

Marc Grootaers, project manager at Schiedel.

As with most large-scale projects, Schiedel was responsible for both supplying and installing the chimneys. Marc Grootaers explains: “Installation is crucial. Chimneys are the driving force behind a heating system: if they are not correctly sized, whether too small or oversized, the boiler will never operate perfectly. You can have the most efficient boiler, but without an effective chimney system it will never achieve maximum efficiency. The boiler can only be perfectly adjusted if the chimney has been correctly sized and installed,” says Marc Grootaers.

Materials, diameter and installation

Yet, according to Marc Grootaers, chimneys are sometimes still overlooked. “I’ve come across building sites where the chimneys had been left off the plans.” A chimney’s performance depends on three factors, Marc Grootaers says: “The quality of the material, the diameter of each flue and the quality of the installation. A correctly installed chimney will last a very long time with the boiler properly adjusted and the necessary maintenance.”  

Question about this story? Ask your question

Wie aan Tivoli GreenCity werkte

  1. schoorstenenSchiedelIn this story
  2. HVAC-installateurDauvister (EDF Luminus)In this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectTivoli GreenCity
  • SubjectProjects
  • CompanySchiedel
  • CompanyDauvister (EDF Luminus)
Share this article

Follow on Installatie & Bouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.