276 kilometres of pipe for a major urban renewal project

The decision to use concrete core activation in combination with geothermal energy was driven by sustainability. But that choice involves a great deal of planning, particularly on a project of this scale. All the parties involved were able to work together at an early stage to design the ideal system.
The buildings have a floor area of around 1,000 m² per storey, which had to be fitted with the concrete core activation system. Normally, around seven manifold locations would be needed for floor areas of this size, spread across the entire storey. The installer would need to run a supply pipe to each manifold, as the manifolds must be able to receive hot or cold water. This installation would then have to be visible, mounted against the ceiling. However, Henco’s reliable connection technology makes it possible to incorporate it in the concrete without risk.

Concrete core activation was chosen in six of the nine buildings at Post X to provide heating
and cooling.
After extensive discussions between the parties involved, installer Thermal Comfort Systems came up with a design in which the manifolds, two per storey, were installed in the central riser shaft, close to the riser pipe. The main advantage of this approach is that no technical equipment is visible against the ceiling or in the raised floor. The project could also have been carried out with just one manifold per storey, but the client requested that each storey be divided into two zones.
Heating and cooling from the ceiling
The manifolds and supply pipes could under no circumstances be installed in the raised floor of the storey above, particularly as other floors are generally occupied by different tenants. This presented a major challenge on the project. TCS therefore installed all the manifolds in the shaft and the pipes in the concrete. This also means that heating and cooling are supplied from the ceiling. The manifolds extend down from the ceiling inside the shaft and remain accessible to tenants at all times. This is the only visible part of the system.

The press fittings distribute hot or cold water to various circuits through Henco 20 mm pipe. These are cast into the concrete.
From the manifold in the central shaft, a Henco supply pipe (26 mm) runs through the ceiling to a Henco press fitting, also located in the ceiling. The press fittings distribute hot or cold water to various circuits through Henco 20 mm pipe. The rest of the distribution system is therefore installed in the ceiling.
Reliable connections
This entire distribution system is installed in the ceiling and cannot be accessed once the concrete has been poured. It was therefore crucial to get the connections right first time. To minimise the risk of errors, the distribution system was prefabricated using T-pieces. Around 40 connections had to be made for each supply pipe. Henco’s reliable connection technology, combined with making the connections in a controlled environment, results in reliable joints and fast, efficient installation.
The sheer scale of this installation is clear from a few striking figures:
• 6 buildings (42,000 m² of activated floor area)
• 41 storeys (around 7 storeys per building)
• 90 phases (2 phases per storey)
• +/- 265,000 metres of 20 mm pipe (265 km of pipe)
• +/- 11,000 metres of 26 mm pipe
• +/- 4,000 T-pieces. Together with other fittings, this brings the total to more
than 13,000 connections
Een zakelijke vraag aan Henco Industries NV? Get in touch
Who worked on it
Post X
- koppeltechniek
Henco - installerThermal Comfort Systems
Keep following this
Get an email when a new story is published. No account needed.
- ProjectPost X
- SubjectProjects
- CompanyHenco Industries NV
- CompanyThermal Comfort Systems