Smoke control damper with minimal installation depth offers greater flexibility

Interest in smoke and heat control is growing, both in day-to-day practice and as legislation evolves. It is no surprise, then, that developers are continuing to refine products in this sector. Trox did just that a few years ago with its EK-JZ smoke control damper, an innovation that is now making its mark in the upgraded ductwork network at Brussels Airport.
The EK-JZ is a smoke control damper with a minimal installation depth. It can therefore be installed directly in, for example, shafts. This is not generally possible with conventional dampers, which are more like fire dampers and need to be integrated much further into the structure. The result is greater flexibility and a wider range of applications for the EK-JZ.

Product selection based on CFD
And it is proving to be a good strategy. Since the EK-JZ came onto the market in late 2017, demand for smoke and heat control solutions has risen considerably. The regulatory framework also sets higher standards for proper installation. Anthony Sonvil, business development safety systems engineer at Trox: “This is particularly evident in the preliminary design work. In the past, a duct and smoke extraction system were enough. Now, you use technology such as CFD to simulate fire scenarios, modelling how smoke will move and spread through a room, and then select the right products on that basis. Having an installation is all well and good, but it is far less useful if the engineering behind it is not up to scratch.
Horizontal and vertical installation
Other advantages of the EK-JZ include the option for installers to position the damper horizontally or vertically and connect four dampers in a row or in a square. “The wide range of installation options, for which declarations of performance (DoPs) are also available, gave us the flexibility we needed for this project,” explains Matthias Houwen, project engineer at engineering consultancy Istema.
Fire-resistant and low leakage
The damper is made entirely from the fire-resistant material Promat. Even the motor is encapsulated in it, which was an added benefit for the end client. The whole assembly can therefore be installed in the fire zone without any problems and continue to operate in the event of an F300 classification. Trox also offers a transition piece from Promat to galvanised steel ductwork. Anthony Sonvil: “The fact that the damper is made from a specific material does not mean the entire network has to be made the same way. When a damper is closed, it is also important to keep leakage as low as possible so that smoke and heat do not spread from one room to another.” The airtightness guaranteed by the EK-JZ was a key requirement for the engineering consultancy, as it meant the existing fans and their associated pressure head could continue to be used. And because other floors are connected to the shared duct, leakage had to be kept to a minimum.

Speed
“The maximum air velocity is another advantage,” says Sonvil. “With the smaller sizes, we can reach 20 metres per second, compared with a previous maximum of 15. The larger sizes can reach 12 metres per second, up from 10. Since we can connect more than one damper, we opt for two smaller sizes instead of one large one. This means the client does not have to make major structural alterations.” Matthias Houwen of Istema adds: “The new smoke and heat exhaust ventilation system needed to extract twice the airflow of the existing system, and we could not change the height of the suspended ceiling. Being able to work with higher air velocities was therefore a huge advantage.”
10 dampers
This proved particularly useful for the Brussels Airport project, which Trox worked on. The main duct was constructed from Promat. The lack of space and the extensions forced Trox to think outside the box. Joeri De Rechter, project manager at Brussels Airport: “Initially, we asked Trox for a standard solution. But after looking into it, the EK-JZ proved to be the best option for the limited space available.” Sonvil adds: “We installed 10 dampers at the junction between the main duct and the galvanised steel ducts, so that each section could be controlled separately and the main duct isolated from the branches. It was not straightforward, but our experience and product knowledge helped us deliver an efficient and safe end result.”
Een zakelijke vraag aan Trox? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeFire safety in building services
- SubjectFire protection
- CompanyTrox
- CompanyPromat