High-performance HVAC system guarantees optimum comfort with minimal noise

No state-of-the-art head office is complete without a high-performance, energy-efficient HVAC system. It is no surprise, then, that H.Essers wanted the very best in terms of climate control. This was right up Bovema’s street, as the Limburg-based transport company’s trusted supplier of heating, cooling and ventilation for many years.
“H.Essers’ new head office comprises several areas: a foyer with an auditorium on the ground floor, large office spaces on levels 1 to 5, and a multi-purpose space on the top floor, currently occupied by a pop-up Michelin-starred restaurant,” says Renaat Penders, managing director at Bovema. “Very different activities sometimes take place in these parts of the building, so the internal heat load often varies too. We therefore provided three separate ventilation systems, sized to suit the specific use of each space and its potential occupancy.”
Choosing climate ceilings
The main priorities in designing the HVAC system were thermal and acoustic comfort. “It is no easy task to provide the right cooling capacity in the workplace without causing draughts or noise disturbance. That is why we chose climate ceilings, which heat and cool the various spaces pleasantly and silently,” explains Renaat Penders. “We also took energy performance into account, of course, especially as H.Essers generates its own electricity using wind turbines and PV panels. To make maximum use of this green electricity, we installed two large, future-proof R32 heat pumps with a capacity of 250 kW. They can operate individually, in bivalent mode or in cascade. This allows heating and cooling to take place simultaneously, according to the requirements of the different spaces. The variable ventilation flow rate is controlled using CO2 measurements. The ventilation units are fitted with high-efficiency thermal wheels to maximise heat recovery.
Close attention to aesthetics
H.Essers and Bovema have worked together for many years. “We are regularly consulted on climate control for the group’s industrial buildings. So it was only natural that we should also equip the new head office with a high-performance HVAC system,” says Renaat Penders. “We had plenty of experience with similar projects, including CKS in Dilsen-Stokkem and Aviovision in Hasselt, so this project posed no insurmountable technical challenges. The installation itself was less straightforward, however, mainly because of the building’s height and the fact that all the services are located in the basement. Getting the 35-metre-high main riser and all the other components into position was quite a feat. As the building is made of concrete and has lots of glass and few walls, we also paid close attention to aesthetics. For example, no grilles are visible anywhere, despite the substantial airflow of 42,000m³/h. Some sections of the climate ceiling are inactive and fitted with a concealed ventilation grille, allowing the 3,000 m² ceiling to run seamlessly throughout. It is great to hear that our efforts and attention to detail have paid off!”
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ProjectHoofdkantoor H.Essers
- ThemeHealthy air and summer comfort
- SubjectHVAC