Events

Three FACQ firsts to discover at Install Day

Three FACQ firsts to discover at Install Day

On Friday 22 November, FACQ welcomes visitors to Install Day at stand no. 88-94. Install Day is the annual event par excellence for professionals, installers and experts in the sanitary sector. It is the ideal opportunity for FACQ to present the latest highlights, showcase its services and answer visitors’ questions with expert advice. Here are FACQ’s three unmissable firsts:

1. Gastite, the innovative flexible pipe system for natural gas and LPG

With Gastite, professionals can work even more efficiently: installation is 70% faster than with traditional pipes. This new system reduces the risk of leaks and requires fewer connections, ensuring a watertight installation.

2. Geberit’s new Silent Pro

This solution is ideal for construction projects requiring a high level of sound insulation. Its new drainage system reduces noise thanks to the special design of the impact zone around the connections.

3. The new version of Villeroy & Boch’s Vi Connect

Vi Connect is an intelligent connection system for toilets, bidets, urinals and washbasins that can be seamlessly integrated into the wall. The range comprises 13 pre-wall installation systems for reliable installation in all conditions, including five elements for dry construction and four for wet rooms. Vi Connect offers a varied range of systems for wall-hung or back-to-wall toilets.

Een zakelijke vraag aan FACQ? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeSafe and efficient water use
  • SubjectEvents
  • CompanyFACQ
Share this article

Advertisement

Follow on Installatie & Bouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.