Carglass: high-efficiency heating and hot water for an advanced logistics centre in Bilzen

Carglass commissioned its new European distribution centre in Bilzen in June 2018. It was a major project for Carglass and the region. The centre replaces four other Carglass sites in the Genk-Hasselt area. With 41,932 m² of storage space, it is also the largest logistics centre in Limburg. It stores 300,000 car windows and 15 million other parts. There is also 2,874 m² of office space. The project represented an investment of € 25 million.
Condensing system delivers estimated energy savings of € 10,000 per year
The site on the Albert Canal in Bilzen was specifically chosen with mobility and sustainability in mind. Three ships call at the site every week, taking 60 lorries off the road each week. The site is also ideally located for rail and road transport.

The building is 16 metres high, which always presents a challenge when it comes to heating. For energy-efficiency reasons, VMA Druart chose condensing warm air heaters on behalf of the client. These needed to be supported by destratification fans to prevent the warm air from collecting beneath the roof. A minimum temperature of 14°C had to be guaranteed.
This was no problem for HVAC distributor Molimex-therm. “Direct-fired warm air heating combined with circulation fans is often the most efficient and environmentally friendly option for a modern logistics building. We have years of experience with it,” says Wim Ros, Sales Manager Benelux at Nortek Global HVAC Belgium and Molimex-therm.

The high-efficiency Reznor RHeco was selected, offering the lowest NOx and CO2 emissions on the market today, at less than 25 ppm. The fully condensing gas-fired warm air heater achieves efficiency of up to 109% at part load and 100% at full load.
“We compared it with a conventional non-condensing system. With the RHeco, Carglass uses 22,989 m3 less gas per year. That represents annual financial savings of no less than € 10,345, based on a gas price of 0.45 €/m3,” says Wim Ros.

The RHeco not only complies with the new European ErP Directive, which came into force in January 2018, but also meets the even stricter standards coming into effect in 2021. A total of 17 RHeco ULSA 100 and 4 RHeco ULSA 25 units were installed.
The 81 Reznor circulation fans ensure that heated air is circulated downwards. This destratification improves comfort by keeping heat at “occupant level”, while also shortening warm-up times. Much less warm air is lost through the roof, which in turn delivers significant energy savings.

The new Carglass building also needed a water heater. High efficiency was a requirement. Molimex-therm’s solution was the A.O. Smith BFC Cyclone. This gas-fired water heater is fully condensing and features a revolutionary low-NOx burner. As a result, the BFC Cyclone achieves a thermal efficiency of 109%. The 60 kW version supplied the required volume for the building.
“Customers and European ErP legislation are becoming increasingly demanding when it comes to water heaters too,” says Wim Ros. “But manufacturers continue to be proactive. For example, the CO2 emissions of current A.O. Smith condensing units are often more than 50% below the new, stricter ErP limit. That is very important to us as a distributor. Molimex-therm customers can count on us to always offer an ErP-compliant, sustainable and energy-efficient product.”
Carglass distribution centre Bilzen project details:
Requirements:
- Efficient, sustainable heating system.
- Minimum temperature of 14°C.
- Optimised for the height of the building.
- High-efficiency water heater.
Project:
Heating and hot water for a new Carglass distribution centre, using warm air heating combined with destratification and a high-efficiency water heater. Belron, the group of which Carglass is part, worked with property investor Montea on the construction. Bedrijfsbouw Verelst from Putte was the contractor. Engineering consultancy Encon worked with VMA Druart on the technical installations. Bjorn Baekelandt of BB 4 CV & SANITAIR carried out the installation on site as a subcontractor. The units were supplied by Molimex-therm.
Technical details:
- 932 m² of storage space and 2,874 m² of offices.
- Heating: Reznor RHeco ULSA modulating, condensing warm air heaters
- 17 Reznor RHeco ULSA 100 units (94.4 kW / 10,500 m3/h)
- 4 RHeco ULSA 25 warm air heaters (25 kW / 2,900 m3/h)
- Destratification: 81 Reznor circulation fans (8,840 m3/h)
- Hot water: A.O. Smith BFC Cyclone 60 sealed, condensing gas-fired water heater (60 kW)
A business enquiry for A.O. Smith BV? Get in touch
Who worked on it
Distributiecentrum Carglass Bilzen in Bilzen-Hoeselt
- gasgestookte boiler
A.O. Smith - property investorMontea
- contractorBedrijfsbouw Verelst
- building servicesStudiebureau Encon
- building servicesVMA Druart
- installatie ter plaatseBB 4 CV & SANITAIR
Keep following this
Get an email when a new story is published. No account needed.
- ProjectDistributiecentrum Carglass Bilzen
- SubjectNews
- CompanyA.O. Smith BV
- CompanyMontea
- CompanyBedrijfsbouw Verelst
- CompanyStudiebureau Encon
- CompanyVMA Druart