ElektroTech

Former industrial warehouse ready for a sustainable future

Text Iris SalembierImage Belcotec / Tineke De Vos

Meer dan 150 eigen werknemers en een tweehonderdtal mensen in onderaanneming zijn dagelijks aan de slag voor Belcotec.
Meer dan 150 eigen werknemers en een tweehonderdtal mensen in onderaanneming zijn dagelijks aan de slag voor Belcotec.

One of the former slaughterhouse halls in Antwerp has been transformed into a new, sustainable high-tech campus for AP Hogeschool. It is one of the first completed projects in the masterplan by Immobel and Triple Living. Belcotec, working as a subcontractor to Vanhout, was also honoured to contribute to this innovative pilot project.

“We are particularly proud of this project, which was quite a feat in many respects,” say Lennert Vanherck and Jef Raeymaekers, project manager and project leader at Belcotec respectively. “The borehole energy storage field was one challenge, but the design also incorporated a lot of exposed services to preserve the character of the original industrial slaughterhouse hall. This meant there was no way to conceal the pipework in ducts or false ceilings, which was no easy matter.”

Belcotec was closely and actively involved at every stage of the construction project, from design through to completion.

Technologies for the future

Belcotec was responsible for all the cooling and heating systems at Campus Hallen. It received help from an unexpected quarter. Antwerp mayor Bart De Wever officially launched the project not with a traditional foundation stone ceremony, but by drilling a borehole for the energy storage field, which provides the college with cooling in summer and heating in winter. Belcotec then installed gas boilers, heat pumps/chillers, underfloor heating and energy distribution via a Tichelmann ring main. It also took care of the general building services, including refrigeration systems for the kitchens and server rooms, as well as the complete sanitary installation, including pipework and equipment. 

Ventilation and extraction

As this technical campus also houses around 27 laboratories, ventilation was another essential part of the project. Belcotec installed around 60 ventilation units, with or without a rotary heat exchanger or plate heat exchanger, and 100% outdoor air to compensate for laboratory extraction. Around ten extraction fans were also required for the laboratory fume cupboards, along with an industrial gas installation (compressed air, acetylene, nitrogen, gas, argon, helium, carbon dioxide, vacuum …). As a multi-services group, Belcotec was the ideal partner for this challenging project, with its demanding and unusual technical requirements.     

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectElektroTech
Share this article

Follow on Installatie & Bouw Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.